Current Drilling
Check back to this page daily to read the latest drilling updates.
| Well | Rig | Report No. |
| Albilbah_CSG1 | Depco Rig 22 | 2 |
| Drilling Supervisors | Country | Permit |
| Tim Green | Australia | ATP 862 |
Notes
July 18, 2011
474 meters. Drilling completed.
July 15, 2011
474 meters. Coring.
July 14, 2011
450 meters. Coring.
July 13, 2011
408 meters. Coring
July 11, 2011
378 meters. Currently tripping in hole with new core bit to core.
July 10, 2011
372 meters. Drill bit stuck in the hole and currently milling on the bit that was left after pipe recovery.
July 8, 2011
Depth 200 meters. Cementing.
July 7, 2011
Depth 200 meters. Cementing.
July 5, 2011
Albilbah_CSG1 spudded on July 5th at 11.00 am local time.
Click here to view the drilling results for Talundilly CSG 1.
474m